Follow these steps to install

Dec 07, 2021

Leave a message

Follow these steps to install


1. Clean the designated area where you lay turf.

2. To make a room for new base, dig the top by 100mm deep or raise it 100mm high.

3. Install a outside frame/edging to make it separate from surroundings surface.

4. For base filling, you can use Recycle Road-base material, Blue-stone dust or Crusher stone (use 20mm stone for 80mm depth and 5mm/fine crush rock for the rest 20mm depth).

5. After filling, Make the entire filing wet, Be sure not to over water your sub base.

6. Compact your area with Hand Compactor or Compactor Plate.

7. Level you area. Fill your area if it is low and scrap off if it high. Spent enough time to make sure It is good level before you lay grass.

8. Unroll the synthetic turf on the surface.

9. Pull and align grass to make sure it lay flat on the surface without any wrinkle.

10. Use few nails on edges to secure grass so it can’t move.

11. Using a art knife or utility knife, cut the extra turf from back side.

12. Use nails to fix the grass to the ground, on edges you can use 3-4 nails in a meter and inside of grass edges you can install 1 nails in every 300 – 400mm apart.

13. Use sand or rubber infill on the grass surface, normally it is 20kg sand on 4m x 1m area. For sand infill, you can calculate your total grass area and divide with 4 whatever the result come, you need that much bags of 20kg sand.

14. Spread evenly sand and then brush up the grass with a electric broom so sand will penetrate and settle down on the grass bottom surface. Make sure do broom to make turf fiber upward.

15. For high traffic area, keep doing regular brooming after few months to keep grass more natural and straight.

 